Search the EPA Research Database
Project Search Result
Project Code [22/NCF/EI/11326]
This information is correct as of today and is updated from time to time by the EPA to reflect changes in the management of the project. Please check back regularly for updates.
Project title
Enhanced Photocatalytic Electrochemical Cells (PEC) for Green Hydrogen Production: Surfaces to Break the Cost and Production Yield Barriers of PEC
Primary Funding Agency
Science Foundation Ireland
Co-Funding Organisation(s)
Lead Organisation
Dublin City University
Lead Applicant
Not listed
Project Abstract
In this project, the photocatalytic production of hydrogen will be developed to create a new understanding of the process while also targeting a dramatic step change improvement in the efficiency. In this method of hydrogen production. Photocatalytic Electrochemical Cells (PECs) are used which contain an anode and cathode at which the water is split producing hydrogen upon exposure to incident standard solar photonic wavelengths. While the generation of hydrogen through the splitting of water by solar energy using semiconductors is attractive for Green hydrogen production, it comes with significant challenges in coming up with a suitable material chemistry and topology which are cheap to implement and converts sunlight efficiently into hydrogen. A variety of photo-anodes with typical maximum efficiencies in the range of 10% have been developed, compared with the 20% theoretical maximum efficiency at a light intensity equivalent to 1 sun for a single band-gap device. In this project, a novel multi-disciplinary approach is taken to solve this research challenge of providing low cost and high yield hydrogen PEC systems. In this project a multi-disciplinary approach is taken, employing chemistry, laser processing, materials science and bubble dynamics developments for the optimisation of hydrogen production.
Grant Approved
�310,485.00
Research Hub
Climate Change
Research Theme
3. Climate Solutions, Transition Management and Opportunities
Initial Projected Completion Date
30/11/2024